Project Overview
In December 2023, CET won the bid for a total of 140 MW data center project in Malaysia. The solution provided by CETincludes the Building Management System(BMS) and the Chiller Plant Operation System(cPos).
Functions
The system realizes full data collection from the data center, including power, HVAC, and environmental data. lt provides realimemonitoring of infrastructure from multiple dimensions, such as inteligent alarm convergence, power system topology, heating,ventilation, and air conditloning (HVAC) system topology, remote monitoring, waveform analysis, report management, and energyconsumption management, lt provides an efficient & reliable monitoring and management platform for the intelligent operation maintenance and energy management of data centers.